Snapshot of Recently Awarded Contracts

2025 awarded contracts

CM-1680, Hudson Line Slope Stabilization

Agency: Metro-North Railroad

Client: HNTB

Anticipated Duration: 2025-2027

2024 awarded contracts

TN-87C/TN-PT, Tower Fender Protections and Tower Painting

Agency: MTA/TBTA

Client: Greenman-Pedersen, Inc. (GPI)

Anticipated Duration: 2024-2028

2023 awarded contracts

CM-1679, Preliminary Design of Four East End Highway Bridges

Agency: LIRR

Client: HDR

Anticipated Duration: 2023-2024

RK-90 and RK-93,

Widening of SB FDR Drive to 116th Street and Reconstruction of Randall’s Island Ramps

Agency: MTA/TBTA

Client: LiRo

Anticipated Duration: 2023-ongoing

Stony Brook University

Rehab Chemistry – Phase I

Agency: SUCF

Client: Goody Clancy

Anticipated Duration: 2023-ongoing

Reconstruction of Sludge Handling Equipment at the Hunts Point Wastewater Resource Recovery Facility

Agency: NYCDEP

Client: Brown and Caldwell

Anticipated Duration: 2023-ongoing

South Battery Park Resiliency Project

Agency: Battery Park City Authority

Client: LiRo

Anticipated Duration: 2023-ongoing

Stony Brook University Medical Roosevelt Services for

Pad-Mounted Emergency Generators

Agency: SUNY

Client: Dewberry

Anticipated Duration: 2023

2022 awarded contracts

D038299, Rehab of 907C (Owl’s Head Viaduct) Over 61st Street, Region 11

Agency: NYSDOT

Client: AECOM

Anticipated Duration: 2022-ongoing

QM-36, Relocation of QMT Switchgear

Agency: MTA C&D

Client: TYLin

Anticipated Duration: 2022-ongoing

CM-1679 #3, Morris Park Turntable Replacement

Agency: Long Island Railroad (LIRR)

Client: HDR

Anticipated Duration: 2022-ongoing

Rehab of Dock Bridge

Agency: Amtrak

Client: Hardesty & Hanover

Anticipated Duration: 2022-2023

CM-1647, Indefinite Quantity Asbestos and Lead Disturbance Management and Air Monitoring Services (Federal)

Agency: MTA C&D

Client: Environmental Planning & Management, Inc./HVA Engineering, D.P.C. JV

Anticipated Duration: 2022-ongoing

CM-1643, Indefinite Quantity Asbestos and Lead Disturbance Management and Air Monitoring Services (State)

Agency: MTA C&D

Client: Environmental Planning & Management, Inc./HVA Engineering, D.P.C. JV

Anticipated Duration: 2022-ongoing

D900050, Van Wyck Contract 2

Agency: NYSDOT

Client: Halmar International LLC

Anticipated Duration: 2022-2023

2021 awarded contracts

Construction of the Combined Sewer Overflow (“CSO”) Abatement Facility at

Gowanus Canal Outfall

Agency: NYCDEP

Client: Hazen and Sawyer/Brown & Caldwell Associates JV

Anticipated Duration: 2022-2024

Rehab of Hempstead Avenue Bridges

Agency: NYCDOT

Client: WSP

Anticipated Duration: 2022-2024

D214813, Term Agreement for Highway Design Support Services

Agency: NYS Thruway Authority

Client: HDR Architecture and Engineering P.C.

Anticipated Duration: 2021-2024

2020 awarded contracts

D900048, Van Wyck Expressway Capacity & Access Improvements

Agency: NYSDOT

Client: Posillico

Anticipated Duration: 2020-2023

Rehab of Glenn Curtiss Bridge over Meadowbrook State Parkway

Agency: Nassau County DPW

Client: Greenman-Pedersen, Inc. (GPI)

Anticipated Duration: 2020-2022

IMG_0075.JPG

fire alarm system replacement

Agency: Lavelle School for the Blind

Client: Lavelle School for the Blind

Anticipated Duration: 2020

IMG_7863.JPG

Rehab of Seeley Street Bridge over prospect avenue

Agency: NYCDOT

Client: STV

Anticipated Duration: 2020-2025


2019 awarded contracts

medgar-evers.jpg

Medgar Evers

AB-1 HVAC Upgrade

Agency: DASNY

Client: GENESYS

Anticipated Duration: 2019

IMG_7124.jpg

FIT On-Call

Agency: FIT

Client: David Smotrich

Anticipated Duration: 2019-2022

IMG_0067.jpg

Rehab of E 174TH St Bridge Over

Sheridan Expressway AMTRAK

Agency: NYCDOT

Client: Jacobs

Anticipated Duration: 2019-2022

IMG_0001.jpg

Lincoln Tunnel Replacement of Intelligent Transportation System (ITS)

Agency: PANYNJ

Client: Advantage Engineering Associates, P.C. (AEA)

Anticipated Duration: 2019-2020

ThrogsNeckBridge.jpg

TN-49 Deck Replacement in

Suspended Span

Agency: TBTA

Client: Greenman-Pedersen Inc. (GPI)

Anticipated Duration: 2019-2024

IMG_0005.jpg

QM-81

Agency: TBTA

Client: EJ Electric

Anticipated Duration: 2019


2018 awarded contracts

Baruch%2BIT%2BCooling%2BTowers%2B050.jpg

Replacement of ITB Cooling Towers at Baruch College

Agency: CUNY

Client: H2M

Anticipated Duration: 2018

tjn1103intransit2.jpg

Replacement of 6th & 10th Avenue

Bridges in Mt. Vernon

Agency: Metro-North Railroad

Client: Louis Berger

Anticipated Duration: 2019-2022

IMG_0119.jpg

Reconstruction of Grand Street Bridge Over Newtown Creek

Agency: NYCDOT

Client: Hardesty & Hanover

Anticipated Duration: 2019-2023

IMG_7162.jpg

Rehabilitation of Harlem River Drive

Connector Ramp to George Washington

Bridge over Harlem River Drive SB

Agency: NYCDOT

Client: Jacobs

Anticipated Duration: 2019-2023

phase+ii+114.jpg

Hunts Point Access Improvements Project

Agency: NYSDOT

Client: Dewberry

Anticipated Duration: 2018-2019

IMG_2861.jpg

VN-89/VN-30, Rehabilitation of Tower Pedestals, Elevators and Mooring Platforms at Verrazano-Narrows Bridge

Agency: TBTA

Client: AECOM-Kiewit

Anticipated Duration: 2019-2020


2017 awarded contracts

IMG_0016.jpg

Asbestos and Lead Air Monitoring

and Testing Services

Agency & Client: Metro-North Railroad

Anticipated Duration: 2018-2023

IMG_0010.jpg

Rehabilitation of Approach Arches,

Towers, Ramp Substructures and

Miscellaneous Repairs at Brooklyn Bridge

Agency: NYCDOT

Client: Greenman-Pedersen Inc. (GPI)

Anticipated Duration: 2019-2023

IMG_0094.jpg

Raise the Shorelines, Citywide

Agency: NYCEDC

Client: Stantec

Anticipated Duration: 2017-2020

IMG_3707.jpg

ENV/Prelim ENG Services for Replacement of Port Authority Bus Terminal

Agency: PANYNJ

Client: WSP

Anticipated Duration: 2018-2020

20180730_072008.jpg

RK-22, Interim Repairs at FDR Ramps to RFK Bridge

Agency: TBTA

Client: GPI & Parsons

Transportation Group JV

Anticipated Duration: 2018-2020